Get a Free Screed Moisture Check from BAL
When tiling to a newly laid screed it is essential that it’s dry enough to tile. As the screed dries it will shrink and move, so tiling too soon will cause the tiles to ‘blow’ or crack resulting in costly repairs. A moisture content of 0.5% or less is the target, 1.0% or less and […]